INS-LiDAR per-axis audit preparation

This page records preparation of the ins-lidar audit using KITTI and Boreas. This page records development and audit preparation. The separate pre-registration fixes the proposed evaluation contract and must be merged before evaluation. The completed first audit is now refuted, 6/8 gates. This page preserves the development and selection record; the three supported sensor pairs on the leaderboard remain unchanged. The frozen registration and original development evidence have not been revised after evaluation.

Proposed claim scope

Evaluate the rotation axes the native trajectory hand-eye method actually observes, their differences to each dataset's reference calibration, the fraction of rotation axes observed, and held-out known-bad controls. Count failed recordings and missing results in the coverage denominator. A prior must not count as observed data, and the proposed method uses no priors.

The clock offset and reference scale remain nuisance parameters. The available dataset calibration alone does not establish an absolute clock-error target, so neither clock accuracy nor a full extrinsic is part of this first proposal. Dataset calibration is a reference estimate, not independent metrology. Passing this scoped audit would not establish superiority over every published method.

The intended coverage is two dataset families and two independent platforms: KITTI and Boreas. Different dates or recordings of the same platform do not count as additional independent rigs.

Metadata access, 2026-10-22

The Boreas devkit provides original Velodyne scans and an Applanix GNSS/INS reference. The data specification describes the frames and reference calibration; the AWS registry lists the public bucket and CC BY 4.0 data license.

tools/boreas_ins_lidar_metadata.py queries only S3 file listings. It cannot GET sensor, calibration or trajectory objects. It fixes candidates by recording names and the first 600 numeric-stem LiDAR filenames, retaining candidates with missing inputs rather than silently replacing them.

The metadata receipt, its JSON schema, and ten raw listing responses preserve the actual names, sizes, ETags and response hashes. The listing bodies total 807,963 bytes. No sensor, trajectory or calibration object bodies were downloaded by that inventory. ETags are object identity pins, not SHA-256 digests of the file contents.

Recording Proposed role at inventory time First 600 LiDAR scans Required Applanix reference
boreas-2020-11-26-13-58 development 3,039,592,056 bytes present
boreas-2020-12-01-13-26 evaluation candidate, not read 3,017,816,496 bytes present
boreas-2020-12-04-14-00 evaluation candidate, not read 3,034,396,584 bytes missing gps_post_process.csv

These are candidates, not a frozen evaluation set. The third recording is not ready for this adapter. Any further candidate selection must be explained by metadata eligibility before reading its trajectory or scans, never by scores. The receipt deliberately leaves the exposure audit marked incomplete.

Development exposure

KITTI 2011_09_26 drives 0005, 0009, 0014, 0015 and 0022 have already been read by INS-LiDAR check/estimate work. The real-data estimate report includes the 0015 round trip; the original handoff omitted it.

KITTI 2011_09_30_drive_0018_sync is also spent for INS-LiDAR development. The trajectory hand-eye performance controls from PR #248 used its OXTS reference with generated sensor motions. Those were performance controls, not independent LiDAR calibration evidence, but their INS reference has been seen and must not be presented as unseen evaluation data.

Boreas boreas-2020-11-26-13-58 is development-only. Its first 64 KiB of the INS CSV and 401-byte calibration were inspected for input-format validation. The subsequent acquisition recipe fixes all first 600 metadata-listed scans, the first 8 MiB of the INS CSV and the reference calibration, with an additional raw-input budget below 4 GiB. Each object is checked against its declared size and ETag and receives a SHA-256 receipt. Failed acquisition attempts are kept. The CSV prefix is clipped only to its last complete newline, with a separate derived-file digest. No evaluation-candidate objects are fetched by this recipe.

The 2011_09_30_0018 generated-motion control must not supply independent accuracy, coverage or detection evidence for the proposed audit. KITTI and Boreas development observations must be distinguished from synthetic controls.

Implemented preparation

  • calibrex.data.boreas_ins_lidar reads the independent Applanix-frame gps_post_process.csv, six-field Velodyne records, and the separate reference extrinsic. Sensor-pose CSVs are refused as the independent trajectory.
  • INS CSV timestamps are seconds; scan filenames are UTC microseconds. Passive rotations follow the official ordered Rx(-roll) Ry(-pitch) Rz(-heading) convention. Noncommuting rotation and timestamp controls test both points.
  • calibrex.evaluation.boreas_ins_lidar reuses the native KITTI hand-eye solver, defaults, held-out blocking, jackknife, controls and artifact schema. Scan registration receives LiDAR alone, with no INS or reference-extrinsic prior. The present baseline treats scans as rigid snapshots, without per-point deskew.
  • tools/score_ins_lidar_sota.py scores only data-estimated rotation axes. It retains missing runs in the denominator, checks finite reference evidence and held-out controls, and reports each family's completion and axis coverage. It does not assign SOTA verdicts or invent an absolute clock-error metric.

The development calibration ran from a separate checkout pinned to a795fb659cc13f12a803642677be01f7fadb012c. The complete acquisition receipt was verified before any scan entered the method. All 600 scans and 599 consecutive registrations were retained; all registrations converged. The native artifact and run report record two observed rotation axes, maximum reference difference 0.19184132984568794 deg, and 0/2 missed 1 deg controls. The overall artifact remains inconclusive for unobserved quantities; these development numbers do not establish a full calibration or a SOTA result.

Four raw-object transfers disconnected during the initial acquisition. The failed receipt, exact-object recovery, and completed receipt are retained. The calibration itself executed once. No method has read the evaluation candidates during this stage.

The proposed error ceiling is ceil(1.5 * 0.19184132984568794 / 0.25) * 0.25, or 0.5 deg. We choose a 0.5 coverage floor in each family, stricter than the handoff's development-derived rounded floor of 0.25. We also require zero control misses in the finite declared evaluation, a stricter integrity gate than its binomial allowance. Two development controls cannot establish a population detection rate or a future 95% sensitivity guarantee.

The fixed cases are KITTI 2011_09_29_0071, 2011_09_30_0020, 2011_09_30_0027 and Boreas boreas-2020-12-01-13-26, first 600 scans each. The KITTI inventory selects the first three eligible records from the existing eighteen-archive metadata pool by order and frame counts. Camera-LiDAR v2 previously read their Velodyne and OXTS streams; this cross-pair exposure is disclosed. KITTI odometry aliases 06 and 07 map to the selected 0020 and 0027 raw drives; alias 05 maps to the excluded, spent 0018. The mapping was checked against the official devkit readme; its archive URL and digest are in the registration.

Completed evaluation

Code was frozen at 5cc11d43e313bec6d29f3de5e549493eee594352 and the binding registration committed separately, then merged in PR #301 before sensor acquisition. Evaluation ran once from merged main at e2ac3e20, with no method reruns or acquisition retries. The 16 GiB raw-data cap and 20 GiB free-disk floor were preserved.

All four commands completed. Eight axes were estimated, with maximum reference difference 0.285729 deg and all eight observed controls detected. KITTI 0071 provided no observable rotation, so completeness and empty-control integrity fail. The result page publishes all cases and the immutable 6/8 refuted verdict. All four windows are now spent for INS-LiDAR evaluation; they are available for development, not a second claim.